Alemlube Plastic Air Hose Reel 10mm x 14m. 90cm Long Lead in Hose AWP1014
MPN: AWP1014
|
RPI: 2507899
Trackable Shipping
Australia Wide
Handling Time
7-10 Business Days Handling Time
(Prior to Dispatch)
(Prior to Dispatch)
Return Policy
No Return (Unless Manufacturer Defect)
Type in your postcode or suburb to get an estimate on postage cost.
Click & Collect (no postage cost)
Unit 1/25 Bearing Road, Seven Hills, NSW, 2147
Ready-to-pickup: 7-10 Business Days*
*You'll receive a notification when your order is ready for pickup. For store details and opening hours, click here
Alemlube Plastic Air Hose Reel 10mm x 14m. 90cm Long Lead in Hose
High quality poly reel
High impact polypropylene provides maximum durability
90cm long lead in hose
Powder coated integral wall/ceiling mounting bracket
Inlet/Outlet: 3/8" BSP(f) / 3/8" BSP(m)
Maximum working pressure: 150psi
Dimensions of 36cm (h) x 20cm (w) x 45cm (d)
Weight: 5.9kg
Write Your Own Review